Washington Administrative Code (Last Updated: November 23, 2016) |
Title 388. Social and Health Services, Department of |
Chapter 388-97. Nursing homes. |
Section 388-97-3460. Preinstallation submissions for new construction.
Latest version.
- The department of health, construction review, must receive and approve preinstallation submissions prior to installation. Preinstallation submissions may include any or all of the following:(1) Stamped shop drawings, hydraulic calculations, and equipment information sheets for fire sprinkler system(s);(2) Shop drawings, battery calculations, and equipment information sheets for fire detection and alarm systems;(3) Shop drawings and equipment information sheets for a kitchen hood and duct automatic fire extinguishing system;(4) Drawings and equipment information sheets for special egress control devices; and(5) Drawings and/or a finish schedule denoting areas to be carpeted with:(a) A coding system identifying type of carpet in each area;(b) A copy the manufacturer's specifications for each type of carpet; and(c) A copy of a testing laboratory report of the radiant panel and smoke density tests for each type of carpet.