Section 296-150T-0550. Do you notify the department of health after your final inspection of factory-built structures at a manufacturing location?  


Latest version.
  • After we perform a final inspection of a factory-built temporary worker housing structure we will send a notice to the department of health that:
    (1) Specifies what connections, standards, and incomplete items the department of health must check when the unit is installed; and/or
    (2) Estimates the expected time of arrival of the factory-built temporary worker housing structure to the site.
    [Statutory Authority: RCW 43.22.480. WSR 99-12-079, § 296-150T-0550, filed 5/28/99, effective 6/28/99.]
RCW 43.22.480. WSR 99-12-079, § 296-150T-0550, filed 5/28/99, effective 6/28/99.