Chapter 296-150T. Factory-built temporary worker housing structures.  


Section 296-150T-0010. Authority, purpose, and scope.
Section 296-150T-0020. What definitions apply to this chapter?
Section 296-150T-0030. How is this chapter enforced?
Section 296-150T-0040. Will you keep my manufacturing information confidential?
Section 296-150T-0050. Can you prohibit the installation of factory-built temporary worker housing structures?
Section 296-150T-0070. Do you have reciprocal agreements with other states to inspect factory-built temporary worker housing structures?
Section 296-150T-0080. Do you allow a local enforcement agency to inspect factory-built temporary worker housing at the manufacturing location?
Section 296-150T-0100. What happens if I disagree with your decision regarding my compliance with this chapter?
Section 296-150T-0110. Do you have an advisory board to address factory-built temporary worker housing structure issues?
Section 296-150T-0120. Where can I obtain technical assistance regarding factory-built temporary worker housing structures?
Section 296-150T-0130. How do I register a complaint?
Section 296-150T-0140. Do you allow the use of alternate materials, alternate design and method of construction?
Section 296-150T-0200. Who must purchase factory-built temporary worker housing insignia?
Section 296-150T-0210. What are the insignia requirements?
Section 296-150T-0220. How do I obtain insignia information and the required forms?
Section 296-150T-0230. What are the insignia application requirements?
Section 296-150T-0250. How do I replace lost or damaged insignia?
Section 296-150T-0300. When is design plan approval required?
Section 296-150T-0320. What must I provide with my request for design-plan approval by the department?
Section 296-150T-0340. What must an engineering analysis for design plans include?
Section 296-150T-0350. What must the test procedures and results for design plans include?
Section 296-150T-0380. What happens if you approve my design plan?
Section 296-150T-0390. If my design plan is not approved, how much time do I have to submit a corrected design plan?
Section 296-150T-0400. What happens after my design plan is approved?
Section 296-150T-0410. When does my design plan expire?
Section 296-150T-0495. Contractor deposit accounts.
Section 296-150T-0500. When is an inspection required?
Section 296-150T-0510. How do I request an inspection?
Section 296-150T-0520. What happens if my factory-built temporary worker housing structure passes inspection?
Section 296-150T-0530. Am I charged if I request an inspection but I am not prepared?
Section 296-150T-0540. Who inspects factory-built temporary worker housing structures for installation at the temporary worker housing site?
Section 296-150T-0550. Do you notify the department of health after your final inspection of factory-built structures at a manufacturing location?
Section 296-150T-0580. Must I obtain an insignia for used factory-built structures?
Section 296-150T-0590. How do I obtain insignia for used factory-built structures?
Section 296-150T-0600. What manufacturing codes apply to factory-built temporary worker housing?
Section 296-150T-0700. Must manufacturers of factory-built temporary worker housing structures notify you if they manufacture at more than one location?
Section 296-150T-0710. Must manufacturers of factory-built temporary worker housing structures notify you of a change in business name or address?
Section 296-150T-0720. Must manufacturers of factory-built temporary worker housing structures notify you of a change in business ownership?
Section 296-150T-3000. Factory-built temporary worker housing fees.