Section 246-296-080. Ineligible projects and project-related costs.  


Latest version.
  • Projects and project-related costs that are not eligible for assistance from the DWSRF program include:
    (1) Acquiring, building, or repairing dams or raw water reservoirs;
    (2) Acquiring water rights, except if the water rights are owned by a public water system that is being acquired by restructuring;
    (3) Laboratory costs for monitoring;
    (4) Operation and maintenance costs;
    (5) Projects needed primarily for fire protection;
    (6) Projects needed primarily to serve future population growth;
    (7) Projects that have received assistance from the national set-aside for Indian tribes and Alaska native villages under Section 1452(i) of the SDWA;
    (8) Projects for an individual water supply system or a Group B public water system unless the public water system is being restructured into a Group A public water system under WAC 246-296-110; and
    (9) Projects that are solely for the purpose of installing service meters.
    [Statutory Authority: RCW 70.119A.170 and Federal Safe Drinking Water Act, H.R. 1452. WSR 12-01-077, § 246-296-080, filed 12/19/11, effective 2/1/12. Statutory Authority: RCW 70.119A.170. WSR 01-21-137, § 246-296-080, filed 10/24/01, effective 11/24/01.]
RCW 70.119A.170 and Federal Safe Drinking Water Act, H.R. 1452. WSR 12-01-077, § 246-296-080, filed 12/19/11, effective 2/1/12. Statutory Authority: RCW 70.119A.170. WSR 01-21-137, § 246-296-080, filed 10/24/01, effective 11/24/01.

Rules

246-296-110,