Washington Administrative Code (Last Updated: November 23, 2016) |
Title 98. Licensing, Department of (Cemetery Board) |
Chapter 98-14. Prearrangement contracts. |
Section 98-14-080. Development plan for unconstructed, undeveloped property.
Latest version.
- Any cemetery authority selling undeveloped graves, unconstructed crypts or niches in accordance with chapter 68.46 RCW must make available to the purchaser at the time the prearrangement contract is signed.• A statement of estimated time schedule of the development or construction.Estimated time schedule must:• Be submitted to the cemetery board annually with the financial reports required by RCW 68.46.090.• Be made available to holders of prearrangement contracts affected by the development or construction in the offices of the cemetery authority.A cemetery authority must maintain an equivalent inventory of constructed crypts, niches and developed graves, equal to ten percent of the unconstructed crypts, niches and undeveloped graves sold through prearrangement contracts. The equivalent inventory must be located within the cemetery or an adjacent cemetery under common ownership.Trust fund deposits required for the prearrangement contract sales of undeveloped property, will be in accordance with RCW 68.46.030.