Section 480-107-065. Eligibility for long-run conservation purchase rates.  


Latest version.
  • (1) Any conservation supplier may participate in the bidding process. A utility may allow a utility subsidiary to participate as a conservation supplier, on conditions described in WAC 480-107-135 Conditions for purchase of electrical power or savings from a utility's subsidiary or affiliate. A decision to allow a utility subsidiary to participate must be explained in the utility's RFP submittal.
    (2) All conservation measures included in a project proposal must:
    (a) Produce electrical savings over a time period greater than five years, or a longer period if specified in the utility's RFP. A measure with an expected life that is shorter than the contract term must include replacements through the contract term;
    (b) Be consistent with the utility's integrated resource plan; and
    (c) Produce savings that can be reliably measured or estimated with accepted engineering methods.
    [Statutory Authority: RCW 80.01.040 and 80.04.160. WSR 06-08-025 (Docket No. UE-030423, General Order No. R-530), § 480-107-065, filed 3/28/06, effective 4/28/06.]
RCW 80.01.040 and 80.04.160. WSR 06-08-025 (Docket No. UE-030423, General Order No. R-530), § 480-107-065, filed 3/28/06, effective 4/28/06.