Section 468-16-210. Prime contractor performance report.


Latest version.
  • (1) The evaluation of contractor performance shall be made on a form substantially in the format as illustrated herein.
    (2) A Prime Contractor Performance Report Manual provides detailed instructions for preparation of the prime contractor performance report.
    [Statutory Authority: RCW 47.01.101, 47.28.030, and 47.28.070. WSR 15-01-170, § 468-16-210, filed 12/23/14, effective 1/23/15; WSR 94-05-004, § 468-16-210, filed 2/2/94, effective 3/5/94; WSR 91-04-014 (Order 128), § 468-16-210, filed 1/28/91, effective 2/28/91.]
RCW 47.01.101, 47.28.030, and 47.28.070. WSR 15-01-170, § 468-16-210, filed 12/23/14, effective 1/23/15; WSR 94-05-004, § 468-16-210, filed 2/2/94, effective 3/5/94; WSR 91-04-014 (Order 128), § 468-16-210, filed 1/28/91, effective 2/28/91.