Section 468-16-040. Criteria for a determination of an unsatisfactory record of performance.  


Latest version.
  • The following list of deficiencies may be considered cause for a determination that an unsatisfactory record of performance exists:
    (1) Failure to complete project on time; or
    (2) Continued workmanship below the level of standard; or
    (3) Failure to adhere to the plans and specifications; or
    (4) Disregard for the welfare or safety of traveling public; or
    (5) Inadequate supervision and control of subcontractors; or
    (6) Insufficient supervision available on project site; or
    (7) Inadequate coordination and planning with owner; or
    (8) Inadequate procurement and delivery of supplies and materials; or
    (9) Inadequate control and utilization of equipment; or
    (10) An overall performance rating in the prime contractor performance report of less than standard as defined in WAC 468-16-030 and 468-16-150.
    [Statutory Authority: RCW 47.01.101, 47.28.030 and 47.28.070. WSR 93-03-020 (Order 134), § 468-16-040, filed 1/12/93, effective 2/12/93; WSR 91-04-014 (Order 128), § 468-16-040, filed 1/28/91, effective 2/28/91.]
RCW 47.01.101, 47.28.030 and 47.28.070. WSR 93-03-020 (Order 134), § 468-16-040, filed 1/12/93, effective 2/12/93; WSR 91-04-014 (Order 128), § 468-16-040, filed 1/28/91, effective 2/28/91.

Rules

468-16-030,468-16-150,