Section 468-16-040. Criteria for a determination of an unsatisfactory record of performance.
Latest version.
- The following list of deficiencies may be considered cause for a determination that an unsatisfactory record of performance exists:(1) Failure to complete project on time; or(2) Continued workmanship below the level of standard; or(3) Failure to adhere to the plans and specifications; or(4) Disregard for the welfare or safety of traveling public; or(5) Inadequate supervision and control of subcontractors; or(6) Insufficient supervision available on project site; or(7) Inadequate coordination and planning with owner; or(8) Inadequate procurement and delivery of supplies and materials; or(9) Inadequate control and utilization of equipment; or(10) An overall performance rating in the prime contractor performance report of less than standard as defined in WAC 468-16-030 and 468-16-150.
Rules
468-16-030,468-16-150,