Section 463-60-205. Proposal—Spillage prevention and control.  


Latest version.
  • The application shall describe all spillage prevention and control measures to be employed regarding accidental and/or unauthorized discharges or emissions, relating such information to specific facilities, including but not limited to locations, amounts, storage duration, mode of handling, and transport. The application shall describe in general detail the content of a Construction Phase and an Operational Phase Spill Prevention, Control and Countermeasure Plan (chapter 40 C.F.R. Part 112 and Hazardous Waste Management Plan) that will be required prior to commencement of construction.
    [Statutory Authority: RCW 80.50.040 (1) and (12). WSR 04-21-013, amended and recodified as § 463-60-205, filed 10/11/04, effective 11/11/04. Statutory Authority: RCW 80.50.040(1) and chapter 80.50 RCW. WSR 81-21-006 (Order 81-5), § 463-42-205, filed 10/8/81. Formerly WAC 463-42-420.]
RCW 80.50.040 (1) and (12). WSR 04-21-013, amended and recodified as § 463-60-205, filed 10/11/04, effective 11/11/04. Statutory Authority: RCW 80.50.040(1) and chapter 80.50 RCW. WSR 81-21-006 (Order 81-5), § 463-42-205, filed 10/8/81. Formerly WAC 463-42-420.