Washington Administrative Code (Last Updated: November 23, 2016) |
Title 463. Energy Facility Site Evaluation Council |
Chapter 463-60. Applications for site certification. |
Section 463-60-135. Proposal—Legal descriptions and ownership interests.
Latest version.
- (1) Principal facility. The application shall contain a legal description of the site to be certified and shall identify the applicants and all nonprivate ownership interests in such land.(2) Associated and transmission facilities. For those facilities described in RCW 80.50.020 (6) and (7) the application shall contain the legal metes and bounds description of the preferred centerline of the corridor necessary to construct and operate the facility contained therein, the width of the corridor, or variations in width between survey stations if appropriate, and shall identify the applicant's and others' ownership interests in lands over which the preferred centerline is described and of those lands lying equidistant for 1/4 mile either side of such center line.[Statutory Authority: RCW 80.50.040 (1) and (12). WSR 04-21-013, amended and recodified as § 463-60-135, filed 10/11/04, effective 11/11/04. Statutory Authority: RCW 80.50.040(1). WSR 83-01-128 (Order 82-6), § 463-42-135, filed 12/22/82. Statutory Authority: RCW 80.50.040(1) and chapter 80.50 RCW. WSR 81-21-006 (Order 81-5), § 463-42-135, filed 10/8/81. Formerly WAC 463-42-190.]
RCW 80.50.040 (1) and (12). WSR 04-21-013, amended and recodified as § 463-60-135, filed 10/11/04, effective 11/11/04. Statutory Authority: RCW 80.50.040(1). WSR 83-01-128 (Order 82-6), § 463-42-135, filed 12/22/82. Statutory Authority: RCW 80.50.040(1) and chapter 80.50 RCW. WSR 81-21-006 (Order 81-5), § 463-42-135, filed 10/8/81. Formerly WAC 463-42-190.