Section 392-900-050. Construction cost allocation (CCA).  


Latest version.
  • The eligible construction cost in the STEM grant program shall be calculated by multiplying the approved square foot area of the projects as set forth in WAC 392-900-040 by the construction cost allocation as set forth in WAC 392-343-060.
    [Statutory Authority: RCW 28A.525.020. WSR 16-20-056, § 392-900-050, filed 9/30/16, effective 10/31/16.]
RCW 28A.525.020. WSR 16-20-056, § 392-900-050, filed 9/30/16, effective 10/31/16.

Rules

392-900-040,392-343-060,