Washington Administrative Code (Last Updated: November 23, 2016) |
Title 392. Public Instruction, Superintendent of |
Chapter 392-344. State assistance in providing school plant facilities—Procedural regulations. |
Section 392-344-060. Energy conservation report contracts.
Latest version.
- Contracts between the school district and the energy conservation consultant, if not included in the architect-engineer contract for professional services, shall stipulate the amount of fee and the consultant's duties, i.e., scope of work, to be performed as required by chapter 392-343 WAC set forth.[Statutory Authority: RCW 28A.525.020. WSR 06-16-032, amended and recodified as § 392-344-060, filed 7/25/06, effective 8/25/06. Statutory Authority: RCW 28A.47.830. WSR 83-21-067 (Order 12-83), § 180-29-060, filed 10/17/83.]
RCW 28A.525.020. WSR 06-16-032, amended and recodified as § 392-344-060, filed 7/25/06, effective 8/25/06. Statutory Authority: RCW 28A.47.830. WSR 83-21-067 (Order 12-83), § 180-29-060, filed 10/17/83.
Rules
392-343,