Washington Administrative Code (Last Updated: November 23, 2016) |
Title 388. Social and Health Services, Department of |
Chapter 388-107. Licensing requirements for enhanced services facilities. |
Section 388-107-0750. Document submittal requirements.
Latest version.
- The facility must:(1) Provide one copy of the functional program;(2) Provide an analysis of likely adverse impacts on current residents and plans to eliminate or mitigate such adverse impacts;(3) Provide for the health, safety, and comfort of residents during construction projects;(4) Ensure that construction documents include two copies of the following:(a) Drawings prepared, stamped, and signed by an architect licensed by the state of Washington under chapter 18.08 RCW. The services of a consulting engineer licensed by the state of Washington may be used for the various branches of the work, if appropriate; and(b) Drawings with coordinated architectural, mechanical, and electrical work drawn to scale showing complete details for construction, including:(i) Site plan(s) showing streets, driveways, parking, vehicle and pedestrian circulation, utility line locations, and location of existing and new buildings;(ii) Dimensioned floor plan(s) with the function of each room and fixed/required equipment designated;(iii) Elevations, sections, and construction details;(iv) Schedule of floor, wall, and ceiling finishes;(v) Schedules of doors and windows – Sizes and type, and door finish hardware;(vi) Mechanical systems – Plumbing and heating/venting/air conditioning; and(vii) Electrical systems, including lighting, power, and communication/notification systems.(c) Specifications that describe with specificity the workmanship and finishes;(d) Shop drawings and related equipment specifications for:(i) An automatic fire sprinkler system when required by other codes; and(ii) An automatic fire alarm system when required by other codes.(5) Submit addenda, change orders, construction change directives or any other deviation from the approved plans prior to their installation; and(6) Provide a written construction project completion notice to the department of health construction review services indicating:(a) The completion date; and(b) The actual construction cost.[Statutory Authority: Chapter 70.97 RCW. WSR 14-19-071, § 388-107-0750, filed 9/12/14, effective 10/13/14.]
Chapter 70.97 RCW. WSR 14-19-071, § 388-107-0750, filed 9/12/14, effective 10/13/14.