Section 372-36-110. Specific requirements of each industry—Sand and gravel washing.  


Latest version.
  • No sand and gravel washings will be discharged to a drain or wasteway unless first passed through a lagoon with a settling period of 2 days.
    [Rule .04.243 (C)(6), filed 3/1/60.]
Rule .04.243 (C)(6), filed 3/1/60.