Section 372-36-090. Specific requirements of each industry—Beet sugar.  


Latest version.
  • (1) No lime wastes, process waters or Steffen's waste shall be discharged to any drain or wasteway or in any way such that it may reach groundwater.
    (2) Flume water may be discharged to a drain or wasteway, but only after grit removal and reuse in the flumes with not more than 40 percent make-up. The waste water discharged to provide for the make-up must be settled in a tank equipped for continuous sludge removal and having a detention period of 2 hours.
    (3) Flume water may be lagooned or used for irrigation.
    [Rule .04.243 (C)(4), filed 3/1/60.]
Rule .04.243 (C)(4), filed 3/1/60.