Washington Administrative Code (Last Updated: November 23, 2016) |
Title 332. Natural Resources, Board and Department of (See Title 222) |
Chapter 332-120. Survey monuments—Removal or destruction. |
Section 332-120-060. Project completion—Perpetuation of the original position.
Latest version.
- (1) After completion of the activity that caused the removal or destruction of the monument, a land surveyor or engineer shall, unless specifically authorized otherwise:(a) Reset a suitable monument at the original survey point or, if that is no longer feasible;(b) Establish permanent witness monuments easily accessible from the original monument to perpetuate the position of the preexisting monument.(2) Land boundary survey monumentation required by this chapter shall meet the requirements of the RCW 58.09.120 and 58.09.130.(3) After completion of the remonumentation, the land surveyor or engineer shall complete the report form required by this chapter and forward it to the department.(4) Additionally, after remonumenting any corner originally monumented by the GLO or BLM, a land corner record form shall also be filed with the county auditor as required by the Survey Recording Act.[Statutory Authority: RCW 58.24.040(8). WSR 94-06-034 (Order 617), § 332-120-060, filed 2/25/94, effective 3/28/94.]
RCW 58.24.040(8). WSR 94-06-034 (Order 617), § 332-120-060, filed 2/25/94, effective 3/28/94.