Section 296-96-05260. When are inspections required?  


Latest version.
  • Inspections are required for each lift installation, alteration or relocation and must be conducted at the completion of the job before the lift is placed into service. The inspection must include a safety test at 125 percent of rated load.
    [Statutory Authority: RCW 70.87.020, 70.87.030, 70.87.034, 70.87.120, 70.87.185 and chapter 70.87 RCW. WSR 01-02-026, § 296-96-05260, filed 12/22/00, effective 1/22/01.]
RCW 70.87.020, 70.87.030, 70.87.034, 70.87.120, 70.87.185 and chapter 70.87 RCW. WSR 01-02-026, § 296-96-05260, filed 12/22/00, effective 1/22/01.