Section 296-96-02420. What are the requirements for temporary construction operating permits?  


Latest version.
  • (1) A thirty-day temporary construction operating permit is for transportation of construction personnel and materials only, not for the transportation by the general public.
    (2) Temporary construction operating permits are valid for thirty days.
    (3) You must contact the department for a reinspection to renew the permit.
    (4) All elevators with expired temporary construction operating permits that have not passed a final inspection may not be operated. Operating an elevator with an expired permit shall result in a civil penalty (see WAC 296-96-01070 (1)(a)).
    (5) Renewal of a temporary operating permit is at the discretion of the department.
    [Statutory Authority: Chapter 70.87 RCW. WSR 07-24-041, § 296-96-02420, filed 11/30/07, effective 1/1/08.]
Chapter 70.87 RCW. WSR 07-24-041, § 296-96-02420, filed 11/30/07, effective 1/1/08.

Rules

296-96-01070,