Section 296-835-13015. Meet specific requirements if you use a flow coating process.  


Latest version.
  • You must:
    (1) Make sure all piping is substantial and rigidly supported.
    (2) Make sure the paint is supplied by a:
    • Gravity tank that does not hold more than ten gallons (38 L)
    OR
    • Direct low-pressure pumping system.
    (3) Have an approved heat-actuated device that shuts down the pumping system if there is a fire.
    Note:
    The area of the sump, and any areas on which paint flows, should be included in the area of dip tank.
    [Statutory Authority: RCW 49.17.010, [49.17].040, and [49.17].050. WSR 02-15-102, § 296-835-13015, filed 7/17/02, effective 10/1/02.]