Section 296-78-775. Signalpersons.  


Latest version.
  • (1) Signalpersons shall give all the signals to the operator in accordance with established standard signals as illustrated in WAC 296-78-830 of this chapter.
    (2) A designated person shall be responsible for the condition and use of all hoisting accessories and for all hitches.
    (3) Before an operator moves a crane upon which an empty chain or cable sling is hanging, both ends of the sling shall be placed on the hook.
    (4) Signalpersons, where necessary, shall walk ahead of the moving load and warn people to keep clear of it. They shall see that the load is carried high enough to clear all obstructions.
    (5) Signalpersons shall notify the person in charge in advance when an extra heavy load is to be handled.
    (6) No person shall be permitted to stand or pass under an electric magnet in use.
    (7) The electrical circuit for electric magnets shall be maintained in good condition. Means for taking up the slack cable shall be provided.
    [Statutory Authority: RCW 49.17.040, 49.17.050 and 49.17.240. WSR 81-18-029 (Order 81-21), § 296-78-775, filed 8/27/81.]
RCW 49.17.040, 49.17.050 and 49.17.240. WSR 81-18-029 (Order 81-21), § 296-78-775, filed 8/27/81.

Rules

296-78-830,