Section 296-32-300. Materials handling and storage.  


Latest version.
  • (1) Poles.
    (a) When working with poles in piles or stacks, work shall be performed from the ends of the poles and precautions shall be taken for the safety of employees at the other end of the pole.
    (b) During pole hauling operations, all loads shall be secured to prevent displacement. Lights, reflectors and/or flags shall be displayed on the end and sides of the load.
    (c) The requirements for installation, removal, or other handling of poles in pole lines are prescribed in WAC 296-32-330 which pertains to overhead lines.
    (d) In the case of hoisting machinery equipped with a positive stop load-holding device, it shall be permissible for the operator to leave their position at the controls (while a load is suspended) for the sole purpose of assisting in positioning the load prior to landing it.
    (e) Prior to unloading steel, poles, crossarms, and similar material, the load shall be thoroughly examined to ascertain that the load has not shifted, that binders or stakes have not broken, and that the load is not otherwise hazardous to employees.
    (2) Cable reels. Cable reels and poles in storage shall be checked or otherwise restrained to prevent uncontrollable movement.
    (3) All tools and materials shall be stored in a safe and orderly manner.
    (4) Workers shall not carry loose materials, tools, or equipment on or in vehicles in a manner that would constitute a hazard.
    (5) All buildings, storage yards, equipment and other property shall be kept in a clean and orderly manner.
    [Statutory Authority: Chapter 49.17 RCW. WSR 94-15-096 (Order 94-07), § 296-32-300, filed 7/20/94, effective 9/20/94; Order 76-38, § 296-32-300, filed 12/30/76; Order 75-41, § 296-32-300, filed 12/19/75.]
Chapter 49.17 RCW. WSR 94-15-096 (Order 94-07), § 296-32-300, filed 7/20/94, effective 9/20/94; Order 76-38, § 296-32-300, filed 12/30/76; Order 75-41, § 296-32-300, filed 12/19/75.

Rules

296-32-330,