Section 296-304-04007. Welding, cutting and heating of hollow metal containers and structures not covered by WAC 296-304-02003.  


Latest version.
  • (1) Drums, containers, or hollow structures which have contained toxic or flammable substances shall, before welding, cutting, or heating is undertaken on them, either be filled with water or thoroughly cleaned of such substances and ventilated and tested.
    (2) Before heat is applied to a drum, container, or hollow structure, a vent or opening shall be provided for the release of any built-up pressure during the application of heat.
    (3) Before welding, cutting, heating or brazing is begun on structural voids such as skegs, bilge keels, fair waters, masts, booms, support stanchions, pipe stanchions or railings, a competent person shall inspect the object and, if necessary, test it for the presence of flammable liquids or vapors. If flammable liquids or vapors are present, the object shall be made safe.
    (4) Objects such as those listed in (3) of this section shall also be inspected to determine whether water or other nonflammable liquids are present which, when heated, would build up excessive pressure. If such liquids are determined to be present, the object shall be vented, cooled, or otherwise made safe during the application of heat.
    (5) Jacketed vessels shall be vented before and during welding, cutting or heating operations in order to release any pressure which may build up during the application of heat.
    [Order 76-7, § 296-304-04007, filed 3/1/76; Order 74-25, § 296-304-04007, filed 5/7/74.]
Order 76-7, § 296-304-04007, filed 3/1/76; Order 74-25, § 296-304-04007, filed 5/7/74.