Section 296-155-52901. Certification and proof load testing—Requirement.  


Latest version.
  • Effective January 1, 2010, all cranes and derricks covered in WAC 296-155-52900 and not exempt in subsection (3) of that section, must be certified and proof load tested annually by an accredited crane certifier recognized by the department.
    Note:
    For additional inspection criteria and proof load testing requirements for specific types of cranes, see:
     
    • WAC 296-155-53202 for mobile cranes.
     
    • WAC 296-155-53204 for articulating boom cranes.
     
    • WAC 296-155-53206 for tower cranes.
     
    • WAC 296-155-53208 for self-erecting tower cranes.
     
    • WAC 296-155-53210 for overhead and bridge cranes.
     
    • WAC 296-155-53212 for derricks.
    [Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.060, and chapter 49.17 RCW. WSR 10-14-100, § 296-155-52901, filed 7/6/10, effective 9/1/10.]
RCW 49.17.010, 49.17.040, 49.17.050, 49.17.060, and chapter 49.17 RCW. WSR 10-14-100, § 296-155-52901, filed 7/6/10, effective 9/1/10.

Rules

296-155-52900,296-155-53202,296-155-53204,296-155-53206,296-155-53208,296-155-53210,296-155-53212,