Section 296-150M-0350. What must the test procedures and results for design plans include?  


Latest version.
  • (1) Tests to an alteration design must be performed and evaluated by a professional engineer or architect licensed in Washington or by a DAPIA who approved the original design plan.
    (2) Test reports must contain the following items:
    (a) A description of the methods or standards that applied to the test;
    (b) Drawings and a description of the item tested;
    (c) A description of the test set-up;
    (d) The procedure used to verify the correct load;
    (e) The procedure used to measure each condition;
    (f) Test data, including applicable graphs and observations of the characteristics and behavior of the item tested;
    (g) Engineering data; and
    (h) Analysis, comments, and conclusion.
    (3) The written test procedures, results, and conclusions must reference the applicable structural alteration design plan.
    [Statutory Authority: RCW 43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. WSR 96-21-146, § 296-150M-0350, filed 10/23/96, effective 11/25/96.]
RCW 43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. WSR 96-21-146, § 296-150M-0350, filed 10/23/96, effective 11/25/96.