Section 296-150F-0460. What information must a manufacturer provide when a professional or firm does the design plan approval?
Latest version.
- You must provide the following information with your approved design plan:(1) A completed departmental design plan approval request form;(2) Two or more sets of the design plans plus elevation drawings, specifications, engineering analysis, and test results and procedures necessary for a complete evaluation of the design. These design plans must have an original wet stamp, be signed, and dated by the approving professional(s) (see WAC 296-150F-0340 and 296-150F-0350);(3) A cover sheet on the design plan noting which professional approved each portion of the design plan;(4) A copy of the authorization letter from us;(5) The design plan fee for design plans approved by professionals or firms (see WAC 296-150F-3000);(6) A professional who designs and certifies that the factory-built home or commercial structure design meets state requirements cannot also approve the design plan in the plan approval process;(7) A professional cannot approve those electrical designs listed in WAC 296-150F-0310(2); and(8) A professional cannot approve plans submitted under a reciprocal agreement.
Rules
296-150F-0340,296-150F-0350,296-150F-3000,296-150F-0310,