Section 296-150C-0350. What must test procedures and results for design plans include?
Latest version.
- (1) Tests to a design must be witnessed by a professional engineer or architect licensed in Washington or by a departmental employee.(2) Test reports must contain the following items:(a) A description of the methods or standards that applied to the test;(b) Drawings and a description of the item tested;(c) A description of the test set-up;(d) The procedure used to verify the correct load;(e) The procedure used to measure each condition;(f) Test data, including applicable graphs and observations of the characteristics and behavior of the item tested; and(g) Analysis, comments, and conclusion.(3) The written test procedures and conclusions must reference the applicable design plan.[Statutory Authority: RCW 43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. WSR 96-21-146, § 296-150C-0350, filed 10/23/96, effective 11/25/96.]
RCW 43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. WSR 96-21-146, § 296-150C-0350, filed 10/23/96, effective 11/25/96.