Section 296-127-01358. Pile drivers.  


Latest version.
  • For the purpose of the Washington state public works law, chapter 39.12 RCW, the work of a pile driver includes, but is not limited to:
    Pile driver (pile buck).
    • The preparation, aligning, plumbing, setting, stressing, testing, pulling, welding, cutting off and capping of piling of any type including steel pile and concrete pile and the splicing, barking, heading and shoeing of piling and the rigging and signaling connected with all of the above.
    • Operating engineer pile driver.
    • Operating any power equipment used for pile driving, such as cranes equipped with drophammers and drums and hoists on A-frame type fixed leads on floating rigs.
    [Statutory Authority: Chapter 39.12 RCW, RCW 43.22.270 and 43.22.051. WSR 00-15-077, § 296-127-01358, filed 7/19/00, effective 7/19/00.]
Chapter 39.12 RCW, RCW 43.22.270 and 43.22.051. WSR 00-15-077, § 296-127-01358, filed 7/19/00, effective 7/19/00.