Section 296-104-105. Inspection—How much time is required for notification of an internal inspection?
Latest version.
Seven days will be considered sufficient notification. The owner or user shall prepare each boiler and unfired pressure vessel for internal inspection and shall prepare for and apply a hydrostatic pressure test whenever necessary on the date specified by the inspector.