Chapter 246-359. Temporary worker housing construction standard. |
Section 246-359-110. Construction without a permit.
Latest version.
- (1) Construction of TWH allowed by this chapter can only begin after a construction permit has been issued by the department of health as described in WAC 246-359-090.(2) A person who begins any work without a construction permit will be subject to an investigation and an investigation fee as described in WAC 246-359-990 whether or not a permit is then or subsequently issued. An investigation and investigation fee will be in addition to any other "additional" inspections or fees described in WAC 246-359-990.(3) The department of health will determine if the person initiating building or work without a required construction permit is:(a) Under the authority of this chapter and must follow the construction permit process defined in this chapter; or(b) Found to be outside the authority of this chapter and must be reported to the jurisdiction having authority and the prosecuting attorney of that jurisdiction.[Statutory Authority: Chapter 70.114A RCW and RCW 43.70.334 through 43.70.340. WSR 15-13-091, § 246-359-110, filed 6/15/15, effective 1/1/16. Statutory Authority: RCW 70.114A.081. WSR 99-03-065, § 246-359-110, filed 1/18/99, effective 2/18/99.]
Chapter 70.114A RCW and RCW 43.70.334 through 43.70.340. WSR 15-13-091, § 246-359-110, filed 6/15/15, effective 1/1/16. Statutory Authority: RCW 70.114A.081. WSR 99-03-065, § 246-359-110, filed 1/18/99, effective 2/18/99.
Rules
246-359-090,246-359-990,246-359-990,