Section 246-272B-05100. Construction oversight and testing.  


Latest version.
  • The design engineer or the engineer's authorized representative shall:
    (1) Conduct inspections to:
    (a) Verify LOSS construction and materials conform with approved plans and specifications; and
    (b) Collect data for the record drawings.
    (2) Inspect the following:
    (a) Poured-in-place sewage tanks construction;
    (b) Installation of proprietary and public domain treatment and dispersal components;
    (c) Installation of LOSS components in difficult conditions including, but not limited to, steep slopes and shallow soils; and
    (d) Placement of sand or other fill material.
    (3) Conduct or witness LOSS component testing to verify that all results fall within acceptable limits:
    (a) Water tightness testing of all tanks under WAC 246-272B-05200; and
    (b) Pressure testing of all new collection and conveyance piping according to an acceptable industry standard; and either
    (c) Pressure and flow testing of the subsurface drip system to verify it functions properly prior to scheduling a LOSS final inspection by the department; or
    (d) Pressure testing of the drainfield to verify it functions properly prior to scheduling a LOSS final inspection by the department.
    (4) Record baseline pressure and flow information and provide passing results to the department during the final inspection.
    [Statutory Authority: RCW 70.118B.020. WSR 11-12-035, § 246-272B-05100, filed 5/25/11, effective 7/1/11.]
RCW 70.118B.020. WSR 11-12-035, § 246-272B-05100, filed 5/25/11, effective 7/1/11.