Section 173-548-020. Establishment of base flows.  


Latest version.
  • (1) Base flows are established for stream management units with monitoring to take place at certain control points as follows:
    STREAM MANAGEMENT UNIT INFORMATION
    (2) Base flows established for the stream management units in WAC 173-548-020(1) are as follows:
    Base Flows in the Methow River
    (All Figures in Cubic Feet Per Second)
    [CODIFICATION NOTE: The graphic presentation of this table has been varied slightly in order that it would fall within the printing specification for the Washington Administrative Code. The following table was too wide to be accommodated in the width of the WAC column. The table as codified has been divided into two tables with Part 1 covering the Lower Methow, Middle Methow and Upper Methow and with Part 2 covering the Methow Headwaters, Early Winters Creek, Chewack River and Twisp River.]
    PART 1
    PART 2
    (3) Base flow hydrographs, as represented in Figure 1 in the document entitled "water resources management program, Methow River basin" dated 1976, shall be used for definition of base flows on those days not specifically identified in WAC 173-548-020(2) and 173-548-030.
    (4) All rights hereafter established shall be subject to the base flows established in WAC 173-548-020 (1) through (3), except as provided under WAC 173-548-030 herein.
    (5) Future appropriations of water which would conflict with base flows shall be authorized, by the director, only in those situations when it is clear that overriding considerations of the public interest will be served.
    [Order DE 76-37, § 173-548-020, filed 12/28/76.]
Order DE 76-37, § 173-548-020, filed 12/28/76.