  • (1) The owner or operator of a proposed new major stationary source or a major modification of an existing major stationary source, as determined according to WAC 173-400-820, is authorized to construct and operate the proposed project provided the following requirements are met:
    (a) The proposed new major stationary source or a major modification of an existing major stationary source will not cause any ambient air quality standard to be exceeded, will not violate the requirements for reasonable further progress established by the SIP and will comply with WAC 173-400-113 (3) and (4) for all air contaminants for which the area has not been designated nonattainment.
    (b) The permitting authority has determined, based on review of an analysis performed by the owner or operator of a proposed new major stationary source or a major modification of an existing major stationary source of alternative sites, sizes, production processes, and environmental control techniques, that the benefits of the project significantly outweigh the environmental and social costs imposed as a result of its location, construction, or modification.
    (c) The proposed new major stationary source or a major modification of an existing major stationary source will comply with all applicable New Source Performance Standards, National Emission Standards for Hazardous Air Pollutants, National Emission Standards for Hazardous Air Pollutants for Source Categories, and emission standards adopted by ecology and the permitting authority.
    (d) The proposed new major stationary source or a major modification of an existing major stationary source will employ BACT for all air contaminants and designated precursors to those air contaminants, except that it will achieve LAER for the air contaminants and designated precursors to those air contaminants for which the area has been designated nonattainment and for which the proposed new major stationary source is major or for which the existing source is major and the proposed modification is a major modification.
    (e) Allowable emissions from the proposed new major stationary source or major modification of an existing major stationary source of that air contaminant and designated precursors to those air contaminants are offset by reductions in actual emissions from existing sources in the nonattainment area. All offsetting emission reductions must satisfy the requirements in WAC 173-400-840.
    (f) The owner or operator of the proposed new major stationary source or major modification of an existing major stationary source has demonstrated that all major stationary sources owned or operated by such person (or by any entity controlling, controlled by, or under common control with such person) in Washington are subject to emission limitations and are in compliance, or on a schedule for compliance, with all applicable emission limitations and standards under the Federal Clean Air Act, including all rules in the SIP.
    (g) If the proposed new source is also a major stationary source within the meaning of WAC 173-400-720, or the proposed modification is also a major modification within the meaning of WAC 173-400-720, it meets the requirements of the PSD program under 40 C.F.R. 52.21 delegated to ecology by EPA Region 10, while such delegated program remains in effect. The proposed new major stationary source or major modification will comply with the PSD program in WAC 173-400-700 through 173-400-750 for all air contaminants for which the area has not been designated nonattainment when that PSD program has been approved into the Washington SIP.
    (h) The proposed new major stationary source or the proposed major modification meets the special protection requirements for federal Class I areas in WAC 173-400-117.
    (i) All requirements of this section applicable to major stationary sources and major modifications of volatile organic compounds shall apply to nitrogen oxides emissions from major stationary sources and major modifications of nitrogen oxides in an ozone transport region or in any ozone nonattainment area, except in an ozone nonattainment area or in portions of an ozone transport region where EPA has granted a NOX waiver applying the standards set forth under section 182(f) of the Federal Clean Air Act and the waiver continues to apply.
    (j) The requirements of this section applicable to major stationary sources and major modifications of PM-10 and PM-2.5 shall also apply to major stationary sources and major modifications of PM-10 and PM-2.5 precursors, except where EPA determines that such sources do not contribute significantly to PM-10 levels that exceed the PM-10 ambient standards in the area.
    (2) Approval to construct shall not relieve any owner or operator of the responsibility to comply fully with applicable provisions of the state implementation plan and any other requirements under local, state or federal law.
    (3) At such time that a particular source or modification becomes a major stationary source or major modification solely by virtue of a relaxation in any enforceable limitation which was established after August 7, 1980, on the capacity of the source or modification otherwise to emit a pollutant, such as a restriction on hours of operation, then the requirements of regulations approved pursuant to 40 C.F.R. 51.165, or the requirements of 40 C.F.R. Part 51, Appendix S, as applicable, shall apply to the source or modification as though construction had not yet commenced on the source or modification. 40 C.F.R. Part 51, Appendix S shall not apply to a new or modified source for which enforceable limitations are established after WAC 173-400-800 through 173-400-850 have been approved into Washington's SIP.
    [Statutory Authority: RCW 70.94.152, 70.94.331, 70.94.860. WSR 16-12-099 (Order 16-01), § 173-400-830, filed 5/31/16, effective 7/1/16. Statutory Authority: Chapter 70.94 RCW. WSR 12-24-027 (Order 11-10), § 173-400-830, filed 11/28/12, effective 12/29/12; WSR 11-06-060 (Order 09-01), § 173-400-830, filed 3/1/11, effective 4/1/11.]
RCW 70.94.152, 70.94.331, 70.94.860. WSR 16-12-099 (Order 16-01), § 173-400-830, filed 5/31/16, effective 7/1/16. Statutory Authority: Chapter 70.94 RCW. WSR 12-24-027 (Order 11-10), § 173-400-830, filed 11/28/12, effective 12/29/12; WSR 11-06-060 (Order 09-01), § 173-400-830, filed 3/1/11, effective 4/1/11.