Section 173-360-630. Responsibilities of certified UST supervisors.  


Latest version.
  • (1) Any certified UST supervisor shall comply with WAC 173-360-600 through 173-360-630, and comply with all federal and state regulations and procedures when performing tank services.
    (2)(a) A checklist must be completed for each regulated activity performed. The certified UST supervisor shall sign the checklist provided by the department within thirty days following the completion of an underground storage tank installation, retrofit, decommissioning, or test.
    (b) An as-built site plan, showing the location of completed tank system installations or retrofitted tank system, including adjacent structures, if present shall be submitted for installations and retrofits. The as-built site plan shall be submitted on the appropriate form provided by the department, or shall be an 8 1/2 inch by 11 inch single page drawing.
    (3) A certified UST supervisor shall report to the department and the tank owner or operator the existence of any confirmed release from an underground tank system that poses a threat to human health and the environment. This report shall be provided to the tank owner or operator immediately, and to the department within seventy-two hours of the discovery of the condition. If the owner or operator are not immediately available, the report should be made immediately to the department.
    (4) A certified UST supervisor shall be present on site at all times tank service activities are being carried out at a tank installation, retrofit, testing, decommissioning project unless otherwise determined by the department. These tasks may include but may not be limited to:
    (a) Preparing the excavation immediately prior to receiving backfill and placement of the tank into the excavation;
    (b) Any movement of the tank vessel, including but not limited to transferring the vessel from the vehicle used to transport it to the project site;
    (c) Setting the tank and its associated piping into the excavation, including placing any anchoring devices and strapping, if any, and backfilling to the level of the tank;
    (d) Placing and connecting the piping system to the tank vessel;
    (e) Installing cathodic protection systems;
    (f) All pressure testing of the underground storage tank system, including associated piping, performed during the installation or retrofitting;
    (g) Completing the backfill and filling of the installation;
    (h) Evaluating preparation for and installing any tank lining system;
    (i) Tank purging or inerting;
    (j) Removal of the tank, removal of sludge from the tank, and cleaning of the tank;
    (k) Removing flammable vapors from tanks;
    (l) Excavating around tanks for removal;
    (m) Field installation and operational testing of cathodic protection systems;
    (n) Inspecting of existing tank and piping systems for corrosion;
    (o) Tank or line tightness testing;
    (p) Inspection of existing tanks for structural integrity;
    (q) Installation of release detection equipment; and
    (r) Conducting a site assessment at tank closure.
    (5) If a certified UST supervisor obtains knowledge, in the course of performing regulated activities, that a regulated underground storage tank has not been registered with the department, or is otherwise out of compliance with the requirements of this chapter, the individual shall inform the tank owner or operator of the notification requirement and any other applicable requirements.
    (6) Proof of supervisor certification shall be available for inspection at any project site.
    [Statutory Authority: Chapter 90.76 RCW. WSR 95-04-102, § 173-360-630, filed 2/1/95, effective 3/4/95; WSR 91-22-020 (Order 91-26), § 173-360-630, filed 10/29/91, effective 11/29/91; WSR 90-24-017, § 173-360-630, filed 11/28/90, effective 12/29/90.]
Chapter 90.76 RCW. WSR 95-04-102, § 173-360-630, filed 2/1/95, effective 3/4/95; WSR 91-22-020 (Order 91-26), § 173-360-630, filed 10/29/91, effective 11/29/91; WSR 90-24-017, § 173-360-630, filed 11/28/90, effective 12/29/90.