Section 173-340-410. Compliance monitoring requirements.  


Latest version.
  • (1) Purpose. There are three types of compliance monitoring: Protection, performance, and confirmational monitoring. The purposes of these three types of compliance monitoring and evaluation of the data are to:
    (a) Protection monitoring. Confirm that human health and the environment are adequately protected during construction and the operation and maintenance period of an interim action or cleanup action as described in the safety and health plan;
    (b) Performance monitoring. Confirm that the interim action or cleanup action has attained cleanup standards and, if appropriate, remediation levels or other performance standards such as construction quality control measurements or monitoring necessary to demonstrate compliance with a permit or, where a permit exemption applies, the substantive requirements of other laws;
    (c) Confirmational monitoring. Confirm the long-term effectiveness of the interim action or cleanup action once cleanup standards and, if appropriate, remediation levels or other performance standards have been attained.
    (2) General requirements. Compliance monitoring shall be required for all cleanup actions, and may be required for interim and emergency actions conducted under this chapter. Unless otherwise directed by the department, a compliance monitoring plan shall be prepared.
    Plans prepared under this section and under an order or decree shall be submitted to the department for review and approval. Protection monitoring may be addressed in the safety and health plan. Performance and confirmational monitoring may be addressed in separate plans or may be combined with other plans or submittals, such as those in WAC 173-340-400 and 173-340-820.
    (3) Contents of a monitoring plan. Compliance monitoring plans may include monitoring for chemical constituents, biological testing, and physical parameters as appropriate for the site. Where the cleanup action includes engineered controls or institutional controls, the monitoring may need to include not only measurements but also documentation of observations on the performance of these controls. Long-term monitoring shall be required if on-site disposal, isolation, or containment is the selected cleanup action for a site or a portion of a site. Such measures shall be required until residual hazardous substance concentrations no longer exceed site cleanup levels established under WAC 173-340-700 through 173-340-760. Compliance monitoring plans shall be specific for the media being tested and shall contain the following elements:
    (a) A sampling and analysis plan meeting the requirements of WAC 173-340-820 which shall explain in the statement of objectives how the purposes of subsection (1) of this section are met;
    (b) Data analysis and evaluation procedures used, to demonstrate and confirm compliance and justification for these procedures, including:
    (i) A description of any statistical method to be employed; or
    (ii) If sufficient data is not available before writing the plan to propose a reliable statistical method to demonstrate and confirm compliance, a contingency plan proposing one or more reliable statistical methods to demonstrate and confirm compliance, and the conditions under which the methods would be used at the facility; and
    (c) Other information as required by the department.
    [Statutory Authority: Chapter 70.105D RCW. WSR 01-05-024 (Order 97-09A), § 173-340-410, filed 2/12/01, effective 8/15/01; WSR 90-08-086, § 173-340-410, filed 4/3/90, effective 5/4/90.]
Chapter 70.105D RCW. WSR 01-05-024 (Order 97-09A), § 173-340-410, filed 2/12/01, effective 8/15/01; WSR 90-08-086, § 173-340-410, filed 4/3/90, effective 5/4/90.

Rules

173-340-400,173-340-820,173-340-700,173-340-760,173-340-820,