Section 173-303-830. Permit changes.  


Latest version.
  • (1) Purpose and applicability. This section describes the types of permit changes that may be made to all permits issued by the director. This section does not apply to permits by rule or interim status permits.
    (2) Transfer of permits.
    (a) A permit may be transferred by the permittee to a new owner or operator only if the permit has been modified or revoked and reissued (under (b) of this subsection or subsection (3) of this section) to identify the new permittee and incorporate such other requirements as may be necessary under the appropriate act.
    (b) Changes in the ownership or operational control of a facility may be made as a Class 1 modification with prior written approval of the director in accordance with subsection (4) of this section. The new owner or operator must submit a revised permit application no later than ninety days prior to the scheduled change. A written agreement containing a specific date for transfer of permit responsibility between the current and new permittees must also be submitted to the director. When a transfer of ownership or operational control occurs, the old owner or operator must comply with the requirements of WAC 173-303-620 (Financial requirements) until the new owner or operator has demonstrated that he or she is complying with the financial requirements. The new owner or operator must demonstrate compliance with the financial requirements within six months of the date of the change of ownership or operational control of the facility. Upon demonstration to the director by the new owner or operator of compliance with the financial requirements, the director will notify the old owner or operator that he or she no longer needs to comply with the financial requirements as of the date of demonstration.
    (3) Modification or revocation and reissuance of permits. When the director receives any information (for example, inspects the facility, receives information submitted by the permittee as required in the permit, receives a request for revocation and reissuance, or conducts a review of the permit file), the director may determine whether or not one or more of the causes listed in (a) and (b) of this subsection for modification or revocation and reissuance or both exist. If cause exists, the director may modify or revoke and reissue the permit accordingly, subject to the limitations of (c) of this subsection, and may request an updated application if necessary. When a permit is modified, only the conditions subject to modification are reopened. All other aspects of the existing permit remain in effect for the duration of the unmodified permit. If a permit is revoked and reissued, the entire permit is reopened and subject to revision and the permit is reissued for a new term. During any revocation and reissuance proceeding, the permittee must comply with all conditions of the existing permit until a new final permit is reissued. If cause does not exist under this subsection, the director will not modify or revoke and reissue the permit, except on request of the permittee. If a permit modification is requested by the permittee, the director will approve or deny the request according to the procedures of subsection (4) of this section. Otherwise, a draft permit must be prepared and public review provided in accordance with WAC 173-303-840.
    (a) Causes for modification. The following are causes for modification, but not revocation and reissuance, of permits; the following may be causes for revocation and reissuance, as well as modification, when the permittee requests or agrees:
    (i) Alterations. There are material and substantial alterations or additions to the permitted facility or activity which occurred after permit issuance which justify the application of permit conditions that are different or absent in the existing permit;
    (ii) Information. Permits may be modified during their terms if the director receives information that was not available at the time of permit issuance (other than revised regulations, guidance, or test methods) and which would have justified the application of different permit conditions at the time of issuance;
    (iii) New statutory requirements or regulations. The standards or regulations on which the permit was based have been changed by statute, through adoption of new or amended standards or regulations or by judicial decision after the permit was issued.
    (iv) Compliance schedules. The director determines good cause exists for modification of a compliance schedule, such as an act of God, strike, flood, or materials shortage, or other events over which the permittee has little or no control and for which there is no reasonably available remedy;
    (v) Notwithstanding any other provision in this section, when a permit for a land disposal facility is reviewed by the director under 173-303-806 (11)(d), the director will modify the permit as necessary to assure that the facility continues to comply with the currently applicable requirements in this chapter.
    (b) Causes for modification or revocation and reissuance. The following are causes to modify, or alternatively, revoke and reissue a permit:
    (i) Cause exists for termination under WAC 173-303-830(5) for final facility permits, and the director determines that modification or revocation and reissuance is appropriate; or
    (ii) The director has received notification of a proposed transfer of the permit.
    (c) Reserve.
    (4) Permit modification at the request of the permittee.
    (a) Class 1 modifications.
    (i) Except as provided in (a)(ii) of this subsection, the permittee may put into effect Class 1 modifications listed in Appendix I of this section under the following conditions:
    (A) The permittee must notify the director concerning the modification by certified mail or other means that establish proof of receipt (including applicable electronic means) within seven calendar days after the change is put into effect. This notice must specify the changes being made to permit conditions or supporting documents referenced by the permit and must explain why they are necessary. Along with the notice, the permittee must provide the applicable information required by WAC 173-303-805, 173-303-806, 173-303-807, and 173-303-808.
    (B) The permittee must send a notice of the modification to all persons on the facility mailing list, maintained by the director in accordance with WAC 173-303-840 (3)(e)(i)(D), and the appropriate units of state and local government, as specified in WAC 173-303-840 (3)(e)(i)(E). This notification must be made within ninety calendar days after the change is put into effect. For the Class 1 modifications that require prior director approval, the notification must be made within ninety calendar days after the director approves the request.
    (C) Any person may request the director to review, and the director may for cause reject, any Class 1 modification. The director must inform the permittee by certified mail that a Class 1 modification has been rejected, explaining the reasons for the rejection. If a Class 1 modification has been rejected, the permittee must comply with the original permit conditions.
    (ii) Class 1 permit modifications identified in Appendix I by 11 may be made only with the prior written approval of the director.
    (iii) For a Class 1 permit modification, the permittee may elect to follow the procedures in (b) of this subsection for Class 2 modifications instead of the Class 1 procedures. The permittee must inform the director of this decision in the notice required in (b)(i) of this subsection.
    (b) Class 2 modifications.
    (i) For Class 2 modifications, listed in Appendix I of this section, the permittee must submit a modification request to the director that:
    (A) Describes the exact change to be made to the permit conditions and supporting documents referenced by the permit;
    (B) Identifies that the modification is a Class 2 modification;
    (C) Explains why the modification is needed; and
    (D) Provides the applicable information required by WAC 173-303-805, 173-303-806, 173-303-807, and 173-303-808.
    (ii) The permittee must send a notice of the modification request to all persons on the facility mailing list maintained by the director and to the appropriate units of state and local government as specified in WAC 173-303-840 (3)(e)(i)(E) and must publish this notice in a major local newspaper of general circulation. This notice must be mailed and published within seven days before or after the date of submission of the modification request, and the permittee must provide to the director evidence of the mailing and publication. The notice must include:
    (A) Announcement of a sixty-day comment period, in accordance with (b)(v) of this subsection, and the name and address of a departmental contact to whom comments must be sent;
    (B) Announcement of the date, time, and place for a public meeting held in accordance with (b)(iv) of this subsection;
    (C) Name and telephone number of the permittee's contact person;
    (D) Name and telephone number of a departmental contact person;
    (E) Location where copies of the modification request and any supporting documents can be viewed and copied; and
    (F) The following statement: "The permittee's compliance history during the life of the permit being modified is available from the department of ecology contact person."
    (iii) The permittee must place a copy of the permit modification request and supporting documents in a location accessible to the public in the vicinity of the permitted facility.
    (iv) The permittee must hold a public meeting no earlier than fifteen days after the publication of the notice required in (b)(ii) of this subsection and no later than fifteen days before the close of the sixty-day comment period. The meeting must be held to the extent practicable in the vicinity of the permitted facility.
    (v) The public will be provided sixty days to comment on the modification request. The comment period will begin on the date the permittee publishes the notice in the local newspaper. Comments should be submitted to the department of ecology contact identified in the public notice.
    (vi)(A) No later than ninety days after receipt of the notification request, the director must:
    (I) Approve the modification request, with or without changes, and modify the permit accordingly;
    (II) Deny the request;
    (III) Determine that the modification request must follow the procedures in (c) of this subsection for Class 3 modifications for the following reasons:
    (AA) There is significant public concern about the proposed modification; or
    (BB) The complex nature of the change requires the more extensive procedures of Class 3;
    (IV) Approve the request, with or without changes, as a temporary authorization having a term of up to one hundred eighty days; or
    (V) Notify the permittee that he or she will decide on the request within the next thirty days.
    (B) If the director notifies the permittee of a thirty-day extension for a decision, the director must, no later than one hundred twenty days after receipt of the modification request:
    (I) Approve the modification request, with or without changes, and modify the permit accordingly;
    (II) Deny the request; or
    (III) Determine that the modification request must follow the procedures in (c) of this subsection for Class 3 modifications for the following reasons:
    (AA) There is significant public concern about the proposed modification; or
    (BB) The complex nature of the change requires the more extensive procedures of Class 3.
    (IV) Approve the request, with or without changes, as a temporary authorization having a term of up to one hundred eighty days.
    (C) If the director fails to make one of the decisions specified in (b)(vi)(B) of this subsection by the one hundred twentieth day after receipt of the modification request, the permittee is automatically authorized to conduct the activities described in the modification request for up to one hundred eighty days, without formal departmental action. The authorized activities must be conducted as described in the permit modification request and must be in compliance with all appropriate standards of 40 C.F.R. Part 265 (as referenced by WAC 173-303-400). If the director approves, with or without changes, or denies the modification request during the term of the temporary or automatic authorization provided for in (b)(vi)(A), (B), or (C) of this subsection, such action cancels the temporary or automatic authorization.
    (D)(I) In the case of an automatic authorization under (b)(vi)(C) of this subsection, or a temporary authorization under (b)(vi)(A)(IV) or (B)(IV) of this subsection, if the director has not made a final approval or denial of the modification request by the date fifty days prior to the end of the temporary or automatic authorization, the permittee must within seven days of that time send a notification to persons on the facility mailing list, and make a reasonable effort to notify other persons who submitted written comments on the modification request, that:
    (AA) The permittee has been authorized temporarily to conduct the activities described in the permit modification request; and
    (BB) Unless the director acts to give final approval or denial of the request by the end of the authorization period, the permittee will receive authorization to conduct such activities for the life of the permit.
    (II) If the owner/operator fails to notify the public by the date specified in (b)(vi)(D)(I) of this subsection, the effective date of the permanent authorization will be deferred until fifty days after the owner/operator notifies the public.
    (E) Except as provided in (b)(vi)(G) of this subsection, if the director does not finally approve or deny a modification request before the end of the automatic or temporary authorization period or reclassify the modification as a Class 3, the permittee is authorized to conduct the activities described in the permit modification request for the life of the permit unless modified later under subsection (3) or (4) of this section. The activities authorized under this subsection (b)(vi)(E) must be conducted as described in the permit modification request and must be in compliance with all appropriate standards of 40 C.F.R. Part 265 (as referenced by WAC 173-303-400).
    (F) In making a decision to approve or deny a modification request, including a decision to issue a temporary authorization or to reclassify a modification as a Class 3, the director must consider all written comments submitted during the public comment period and must respond in writing to all significant comments in his or her decision.
    (G) With the written consent of the permittee, the director may extend indefinitely or for a specified period the time periods for final approval or denial of a modification request or for reclassifying a modification as a Class 3.
    (vii) The director may deny or change the terms of a Class 2 permit modification request under (b)(i) through (iii) of this subsection for the following reasons:
    (A) The modification request is incomplete;
    (B) The requested modification does not comply with the appropriate requirements of WAC 173-303-280 through 173-303-395 and 173-303-600 through 173-303-680 or other applicable requirements; or
    (C) The conditions of the modification fail to protect human health and the environment.
    (viii) The permittee may perform any construction associated with a Class 2 permit modification request beginning sixty days after the submission of the request unless the director establishes a later date for commencing construction and informs the permittee in writing before day sixty.
    (c) Class 3 modifications.
    (i) For Class 3 modifications listed in Appendix I of this section, the permittee must submit a modification request to the director that:
    (A) Describes the exact change to be made to the permit conditions and supporting documents referenced by the permit;
    (B) Identifies that the modification is a Class 3 modification;
    (C) Explains why the modification is needed; and
    (D) Provides the applicable information required by WAC 173-303-805, 173-303-806, 173-303-807, and 173-303-808.
    (ii) The permittee must send a notice of the modification request to all persons on the facility mailing list maintained by the director and to the appropriate units of state and local government as specified in WAC 173-303-840 (3)(e)(i)(D) and must publish this notice in a major local newspaper of general circulation. This notice must be mailed and published within seven days before or after the date of submission of the modification request, and the permittee must provide to the director evidence of the mailing and publication. The notice must include:
    (A) Announcement of a sixty-day comment period, and a name and address of an agency contact to whom comments must be sent;
    (B) Announcement of the date, time, and place for a public meeting on the modification request, in accordance with (c) (iv) of this subsection;
    (C) Name and telephone number of the permittee's contact person;
    (D) Name and telephone number of a departmental contact person;
    (E) Location where copies of the modification request and any supporting documents can be viewed and copied; and
    (F) The following statement: "The permittee's compliance history during the life of the permit being modified is available from the department of ecology contact person."
    (iii) The permittee must place a copy of the permit modification request and supporting documents in a location accessible to the public in the vicinity of the permitted facility.
    (iv) The permittee must hold a public meeting no earlier than fifteen days after the publication of the notice required in (c)(ii) of this subsection and no later than fifteen days before the close of the sixty-day comment period. The meeting must be held to the extent practicable in the vicinity of the permitted facility.
    (v) The public will be provided at least sixty days to comment on the modification request. The comment period will begin on the date the permittee publishes the notice in the local newspaper. Comments should be submitted to the department of ecology contact identified in the notice.
    (vi) After the conclusion of the sixty-day comment period, the director must grant or deny the permit modification request according to the permit modification procedures of WAC 173-303-840. In addition, the director must consider and respond to all significant written comments received during the sixty-day comment period.
    (d) Other modifications.
    (i) In the case of modifications not explicitly listed in Appendix I of this section, the permittee may submit a Class 3 modification request to the department, or he or she may request a determination by the director that the modification should be reviewed and approved as a Class 1 or Class 2 modification. If the permittee requests that the modification be classified as a Class 1 or 2 modification, he or she must provide the department with the necessary information to support the requested classification.
    (ii) The director will make the determination described in (d)(i) of this subsection as promptly as practicable. In determining the appropriate class for a specific modification, the director will consider the similarity of the modification to other modifications codified in Appendix I and the following criteria:
    (A) Class 1 modifications apply to minor changes that keep the permit current with routine changes to the facility or its operation. These changes do not substantially alter the permit conditions or reduce the capacity of the facility to protect human health or the environment. In the case of Class 1 modifications, the director may require prior approval.
    (B) Class 2 modifications apply to changes that are necessary to enable a permittee to respond, in a timely manner, to:
    (I) Common variations in the types and quantities of the wastes managed under the facility permit;
    (II) Technological advancements; and
    (III) Changes necessary to comply with new regulations, where these changes can be implemented without substantially changing design specifications or management practices in the permit.
    (C) Class 3 modifications substantially alter the facility or its operation.
    (e) Temporary authorizations.
    (i) Upon request of the permittee, the director may, without prior public notice and comment, grant the permittee a temporary authorization in accordance with this subsection. Temporary authorizations must have a term of not more than one hundred eighty days.
    (ii)(A) The permittee may request a temporary authorization for:
    (I) Any Class 2 modification meeting the criteria in (e)(iii)(B) of this subsection; and
    (II) Any Class 3 modification that meets the criteria in (e)(iii)(B)(I) or (II) of this subsection; or that meets the criteria in (e)(iii)(B)(III) through (V) of this subsection and provides improved management or treatment of a dangerous waste already listed in the facility permit.
    (B) The temporary authorization request must include:
    (I) A description of the activities to be conducted under the temporary authorization;
    (II) An explanation of why the temporary authorization is necessary; and
    (III) Sufficient information to ensure compliance with the standards in WAC 173-303-280 through 173-303-395 and 173-303-600 through 173-303-680.
    (C) The permittee must send a notice about the temporary authorization request to all persons on the facility mailing list maintained by the director and to appropriate units of state and local governments as specified in WAC 173-303-840 (3)(e)(i)(D). This notification must be made within seven days of submission of the authorization request.
    (iii) The director will approve or deny the temporary authorization as quickly as practical. To issue a temporary authorization, the director must find:
    (A) The authorized activities are in compliance with the standards of WAC 173-303-280 through 173-303-395 and 173-303-600 through 173-303-680.
    (B) The temporary authorization is necessary to achieve one of the following objectives before action is likely to be taken on a modification request:
    (I) To facilitate timely implementation of closure or corrective action activities;
    (II) To allow treatment or storage in tanks, containers, or in containment buildings in accordance with 40 C.F.R. Part 268;
    (III) To prevent disruption of ongoing waste management activities;
    (IV) To enable the permittee to respond to sudden changes in the types or quantities of the wastes managed under the facility permit; or
    (V) To facilitate other changes to protect human health and the environment.
    (iv) A temporary authorization may be reissued for one additional term of up to one hundred eighty days provided that the permittee has requested a Class 2 or 3 permit modification for the activity covered in the temporary authorization, and:
    (A) The reissued temporary authorization constitutes the director's decision on a Class 2 permit modification in accordance with (b)(vi)(A)(IV) or (B)(IV) of this subsection; or
    (B) The director determines that the reissued temporary authorization involving a Class 3 permit modification request is warranted to allow the authorized activities to continue while the modification procedures of (c) of this subsection are conducted.
    (f) Public notice and appeals of permit modification decisions.
    (i) The director will notify persons on the facility mailing list and appropriate units of state and local government within ten days of any decision under this section to grant or deny a Class 2 or 3 permit modification request. The director will also notify such persons within ten days after an automatic authorization for a Class 2 modification goes into effect under (b)(vi)(C) or (E) of this subsection.
    (ii) The director's decision to grant or deny a Class 2 or 3 permit modification request under this section may be appealed under the permit appeal procedures of WAC 173-303-845.
    (iii) An automatic authorization that goes into effect under (b)(vi)(C) or (E) of this subsection may be appealed under the permit appeal procedures of WAC 173-303-845; however, the permittee may continue to conduct the activities pursuant to the automatic authorization until the appeal has been granted pursuant to WAC 173-303-845, notwithstanding the provisions of WAC 173-303-840 (8)(b).
    (g) Newly regulated wastes and units.
    (i) The permittee is authorized to continue to manage wastes listed or identified as dangerous under WAC 173-303-070, or to continue to manage dangerous waste in units newly regulated as dangerous waste management units, if:
    (A) The unit was in existence as a dangerous waste facility with respect to the newly listed or identified waste or newly regulated waste management unit on the effective date of the final rule listing or identifying the waste, or regulating the unit;
    (B) The permittee submits a Class 1 modification request on or before the date on which the waste or unit becomes subject to the new requirements;
    (C) The permittee is in compliance with the applicable standards of 40 C.F.R. Part 265 (as referenced in WAC 173-303-400) and Part 266 (as referenced in WAC 173-303-510);
    (D) The permittee also submits a complete Class 2 or 3 permit modification request within one hundred eighty days of the effective date of the rule listing or identifying the waste, or subjecting the unit to management standards under this chapter; and
    (E) In the case of land disposal units, the permittee certifies that each such unit is in compliance with all applicable requirements of 40 C.F.R. Part 265 for groundwater monitoring and financial responsibility (as referenced in WAC 173-303-400) on the date twelve months after the effective date of the rule identifying or listing the waste as dangerous, or regulating the unit as a dangerous waste management unit. If the owner or operator fails to certify compliance with all these requirements, he or she will lose authority to operate under this section.
    (ii) New wastes or units added to a facility's permit under this subsection do not constitute expansions for the purpose of the twenty-five percent capacity expansion limit for Class 2 modifications.
    (h) Military dangerous waste munitions treatment and disposal. The permittee is authorized to continue to accept waste military munitions notwithstanding any permit conditions barring the permittee from accepting off-site wastes, if:
    (i) The facility was in existence as a dangerous waste facility, and the facility was already permitted to handle the waste military munitions, on the date when the waste military munitions became subject to dangerous waste regulatory requirements;
    (ii) On or before the date when the waste military munitions become subject to dangerous waste regulatory requirements, the permittee submits a Class 1 modification request to remove or amend the permit provision restricting the receipt of off-site waste munitions; and
    (iii) The permittee submits a complete Class 2 modification request within one hundred eighty days of the date when the waste military munitions became subject to dangerous waste regulatory requirements.
    (i) Permit modification list. The director must maintain a list of all approved permit modifications and must publish a notice once a year in a statewide newspaper that an updated list is available for review.
    (j) Combustion facility changes to meet 40 C.F.R. Part 63 MACT standards. (Note that 40 C.F.R. Part 63 subpart EEE is incorporated by reference at WAC 173-400-075 (5)(a). If you are subject to Part 63, you must get an air permit from ecology or the local air authority.) The following procedures apply to hazardous waste combustion facility permit modifications requested under Appendix I of this section, section L.9.
    (i) Facility owners or operators must have complied with the Notification of Intent to Comply requirements of 40 C.F.R. 63.1210 that were in effect prior to October 11, 2000 (see 40 C.F.R. Part 63 sections 63.1200 - 63.1499 revised as of July 1, 2000) in order to request a permit modification under this section for the purpose of technology changes needed to meet the standards under 40 C.F.R. 63.1203, 63.1204, and 63.1205.
    (ii) Facility owners or operators must comply with the Notification of Intent to Comply (NIC) requirements of 40 C.F.R. 63.1210(b) and 63.1212(a) before a permit modification can be requested under this subsection for the purpose of technology changes needed to meet the 40 C.F.R. 63.1215, 63.1216, 63.1217, 63.1218, 63.1219, 63.1220, and 63.1221 standards promulgated on October 12, 2005.
    (iii) If the department does not approve or deny the request within ninety days of receiving it, the request will be deemed approved. The director may extend this ninety-day deadline one time for up to thirty days by notifying the facility owner or operator.
    (k) Waiver of dangerous waste permit conditions in support of transition to the 40 C.F.R. Part 63 MACT standards. (Note that 40 C.F.R. Part 63 subpart EEE is incorporated by reference at WAC 173-400-075 (5)(a). If you are subject to Part 63, you must get an air permit from ecology or the local air authority.)
    (i) You may request to have specific Hazardous Waste Management Act and dangerous waste regulation operating and emissions limits waived by submitting a Class 1 permit modification request under Appendix I of this section, section L(10). You must:
    (A) Identify the specific dangerous waste permit operating and emissions limits which you are requesting to waive;
    (B) Provide an explanation of why the changes are necessary in order to minimize or eliminate conflicts between the dangerous waste permit and MACT compliance; and
    (C) Discuss how the revised provisions will be sufficiently protective.
    (D) The department will approve or deny the request within thirty days of receipt of the request. The department may, at its discretion, extend this thirty-day deadline one time for up to thirty days by notifying the facility owner or operator.
    (ii) To request this modification in conjunction with MACT performance testing where permit limits may only be waived during actual test events and pretesting, as defined under 40 C.F.R. 63.1207 (h)(2)(i) and (ii), for an aggregate time not to exceed seven hundred twenty hours of operation (renewable at the discretion of the department) you must:
    (A) Submit your modification request to the director at the same time you submit your test plans to the department; and
    (B) The department may elect to approve or deny the request contingent upon approval of the test plans.
    APPENDIX I
    (5) Permit termination. The director will follow the applicable procedures in WAC 173-303-840, procedures for decision making, in terminating any permit. The following are causes for terminating a permit during its term or for denying a permit renewal application:
    (a) Noncompliance by the permittee with any condition of the permit;
    (b) The permittee's failure in the application or during the permit issuance process to disclose fully all relevant facts, or the permittee's misrepresentation of any relevant facts at any time; or
    (c) A determination that the permitted activity endangers public health or the environment and can only be regulated to acceptable levels by permit modification or termination.
    [Statutory Authority: Chapter 70.105 RCW. WSR 15-01-123 (Order 13-07), § 173-303-830, filed 12/18/14, effective 1/18/15. Statutory Authority: Chapters 70.105 and 70.105D RCW. WSR 09-14-105 (Order 07-12), § 173-303-830, filed 6/30/09, effective 7/31/09. Statutory Authority: Chapters 70.105, 70.105D, and 15.54 RCW and RCW 70.105.007. WSR 04-24-065 (Order 03-10), § 173-303-830, filed 11/30/04, effective 1/1/05. Statutory Authority: Chapters 70.105 and 70.105D RCW. WSR 03-07-049 (Order 02-03), § 173-303-830, filed 3/13/03, effective 4/13/03. Statutory Authority: Chapters 70.105, 70.105D, 15.54 RCW and RCW 70.105.007. WSR 00-11-040 (Order 99-01), § 173-303-830, filed 5/10/00, effective 6/10/00. Statutory Authority: Chapters 70.105 and 70.105D RCW. WSR 98-03-018 (Order 97-03), § 173-303-830, filed 1/12/98, effective 2/12/98; WSR 95-22-008 (Order 94-30), § 173-303-830, filed 10/19/95, effective 11/19/95; WSR 94-01-060 (Order 92-33), § 173-303-830, filed 12/8/93, effective 1/8/94. Statutory Authority: Chapters 70.105 and 70.105D RCW, 40 C.F.R. Part 271.3 and RCRA § 3006 (42 U.S.C. 3251). WSR 91-07-005 (Order 90-42), § 173-303-830, filed 3/7/91, effective 4/7/91. Statutory Authority: Chapter 70.105 RCW. WSR 89-02-059 (Order 88-24), § 173-303-830, filed 1/4/89; WSR 87-14-029 (Order DE-87-4), § 173-303-830, filed 6/26/87; WSR 84-09-088 (Order DE 83-36), § 173-303-830, filed 4/18/84. Statutory Authority: RCW 70.95.260 and chapter 70.105 RCW. WSR 82-05-023 (Order DE 81-33), § 173-303-830, filed 2/10/82.]
Chapter 70.105 RCW. WSR 15-01-123 (Order 13-07), § 173-303-830, filed 12/18/14, effective 1/18/15. Statutory Authority: Chapters 70.105 and 70.105D RCW. WSR 09-14-105 (Order 07-12), § 173-303-830, filed 6/30/09, effective 7/31/09. Statutory Authority: Chapters 70.105, 70.105D, and 15.54 RCW and RCW 70.105.007. WSR 04-24-065 (Order 03-10), § 173-303-830, filed 11/30/04, effective 1/1/05. Statutory Authority: Chapters 70.105 and 70.105D RCW. WSR 03-07-049 (Order 02-03), § 173-303-830, filed 3/13/03, effective 4/13/03. Statutory Authority: Chapters 70.105, 70.105D, 15.54 RCW and RCW 70.105.007. WSR 00-11-040 (Order 99-01), § 173-303-830, filed 5/10/00, effective 6/10/00. Statutory Authority: Chapters 70.105 and 70.105D RCW. WSR 98-03-018 (Order 97-03), § 173-303-830, filed 1/12/98, effective 2/12/98; WSR 95-22-008 (Order 94-30), § 173-303-830, filed 10/19/95, effective 11/19/95; WSR 94-01-060 (Order 92-33), § 173-303-830, filed 12/8/93, effective 1/8/94. Statutory Authority: Chapters 70.105 and 70.105D RCW, 40 C.F.R. Part 271.3 and RCRA § 3006 (42 U.S.C. 3251). WSR 91-07-005 (Order 90-42), § 173-303-830, filed 3/7/91, effective 4/7/91. Statutory Authority: Chapter 70.105 RCW. WSR 89-02-059 (Order 88-24), § 173-303-830, filed 1/4/89; WSR 87-14-029 (Order DE-87-4), § 173-303-830, filed 6/26/87; WSR 84-09-088 (Order DE 83-36), § 173-303-830, filed 4/18/84. Statutory Authority: RCW 70.95.260 and chapter 70.105 RCW. WSR 82-05-023 (Order DE 81-33), § 173-303-830, filed 2/10/82.

Rules

173-303-620,173-303-840,173-303-806,173-303-805,173-303-806,173-303-807,173-303-808,173-303-840,173-303-840,173-303-805,173-303-806,173-303-807,173-303-808,173-303-840,173-303-400,173-303-400,173-303-280,173-303-395,173-303-600,173-303-680,173-303-805,173-303-806,173-303-807,173-303-808,173-303-840,173-303-840,173-303-280,173-303-395,173-303-600,173-303-680,173-303-840,173-303-280,173-303-395,173-303-600,173-303-680,173-303-845,173-303-845,173-303-845,173-303-840,173-303-070,173-303-400,173-303-510,173-303-400,173-400-075,173-400-075,173-303-840,