Chapter 173-240. Submission of plans and reports for construction of wastewater facilities. |
Section 173-240-160. Requirement for professional engineer.
Latest version.
- (1) All required engineering reports, and plans and specifications for the construction or modification of wastewater facilities must be prepared under the supervision of a professional engineer licensed in accordance with chapter 18.43 RCW. All copies of these documents submitted to the department for review shall bear the seal of the professional engineer under whose supervision they have been prepared.(2) Upon request of the owner, the department may waive the above requirement for construction or modification at industrial wastewater facilities.[Statutory Authority: RCW 90.48.110. WSR 00-15-021 (Order 00-09), § 173-240-160, filed 7/11/00, effective 8/11/00. Statutory Authority: Chapters 43.21A and 90.48 RCW. WSR 83-23-063 (Order DE 83-30), § 173-240-160, filed 11/16/83. Statutory Authority: RCW 90.48.110. WSR 79-02-033 (Order DE 78-10), § 173-240-160, filed 1/23/79. Formerly chapter 372-20 WAC.]
RCW 90.48.110. WSR 00-15-021 (Order 00-09), § 173-240-160, filed 7/11/00, effective 8/11/00. Statutory Authority: Chapters 43.21A and 90.48 RCW. WSR 83-23-063 (Order DE 83-30), § 173-240-160, filed 11/16/83. Statutory Authority: RCW 90.48.110. WSR 79-02-033 (Order DE 78-10), § 173-240-160, filed 1/23/79. Formerly chapter 372-20 WAC.