Washington Administrative Code (Last Updated: November 23, 2016) |
Title 173. Ecology, Department of (See Titles 197, 317, 372, and 508) |
Chapter 173-186. Oil spill contingency plan—Railroad. |
Section 173-186-310. Equipment planning standards.
Latest version.
- (1) The equipment necessary to address the worst case spill volume is brought to an incident over a period of time. The methodology to determine this is described in WAC 173-186-380 and 173-186-400. The spreadsheet referred to in WAC 173-186-380 will be used to demonstrate compliance with these equipment requirements.(2) The following planning points shall be used to calculate the equipment access and timelines, as applicable to the plan holder. There shall be at least one planning point for each plan. If rail operates in an area where a planning point does not exist, ecology will develop one or more planning points during the plan review process.(3) All rail plan holders shall demonstrate access to the equipment in the table below within the time frames identified based on the areas rail plan holders operate.[Statutory Authority: RCW 90.56.210. WSR 16-18-052 (Order 15-14), § 173-186-310, filed 8/31/16, effective 10/1/16.]
RCW 90.56.210. WSR 16-18-052 (Order 15-14), § 173-186-310, filed 8/31/16, effective 10/1/16.
Rules
173-186-380,173-186-400,173-186-380,