Section 173-182-324. Planning standards for Group 5 Oils.  


Latest version.
  • (1) Plan holders carrying, handling, storing, or transporting Group 5 Oils must have a contract with a PRC that maintains the resources and/or capabilities necessary to respond to a spill of Group 5 Oils. Such equipment shall include, but is not limited to, the following:
    (a) Sonar, sampling equipment or other methods to locate the oil on the bottom or suspended in the water column;
    (b) Containment boom, sorbent boom, silt curtains, or other methods for containing the oil that may remain floating on the surface or to reduce spreading on the bottom;
    (c) Dredges, pumps, or other equipment necessary to recover oil from the bottom and shoreline;
    (d) Equipment necessary to assess the impact of such discharges; and
    (e) Other appropriate equipment necessary to respond to a discharge involving the type of oil handled, stored, or transported.
    (2) The equipment must be capable of being on scene within twelve hours of spill notification.
    [Statutory Authority: Chapters 88.46, 90.48, 90.56 RCW, and 2011 c 122. WSR 13-01-054 (Order 11-06), § 173-182-324, filed 12/14/12, effective 1/14/13.]
Chapters 88.46, 90.48, 90.56 RCW, and 2011 c 122. WSR 13-01-054 (Order 11-06), § 173-182-324, filed 12/14/12, effective 1/14/13.