Washington Administrative Code (Last Updated: November 23, 2016) |
Title 173. Ecology, Department of (See Titles 197, 317, 372, and 508) |
Chapter 173-180. Facility oil handling standards. |
Section 173-180-230. Preloading or cargo transfer plan requirement.
Latest version.
- Prior to any oil transfer, a transfer plan must be filled out and discussed between the delivering and receiving PICs. A facility must not begin a transfer until this plan has been discussed during the pretransfer conference described in WAC 173-180-235. The plan must, at a minimum, include:(1) Identification, location and capacity of the vessel's tanks receiving oil;(2) Level and type of liquid in all bunker or cargo oil tanks prior to the oil transfer;(3) Final ullage or innage, and percent of each tank to be filled;(4) Sequence in which the tanks are to be filled; and(5) The facility or vessel's procedures to regularly monitor all receiving tank levels and valve alignments during the transfer operation.
Rules
173-180-235,