Section 173-166-100. Funding assistance—Agricultural criteria.  


Latest version.
  • (1) Funding assistance to alleviate drought conditions in irrigated agriculture will be provided under the following formula:
    (a) No single entity will receive more than ten percent of the total funds available for drought relief.
    (b) A loan may be made for up to ninety percent of total eligible project costs.
    (c) A combination loan and grant may be made for up to one hundred percent of total eligible project costs.
    (d) A grant or the grant portion of a combination loan and grant may be made for twenty percent of total eligible project costs if the public body being provided funds is within a geographical area declared to be suffering from drought conditions as defined in WAC 173-166-030(2).
    (e) The grant or grant portion of a combination loan and grant may be made for up to forty percent of total eligible project costs if the public body being provided funds is receiving, or is forecast to receive, fifty percent or less of normal seasonal water supplies.
    (f) A grant or the grant portion of a combination loan and grant may be amended to increase the grant up to forty percent of eligible project costs if drought conditions as defined in this chapter change after a grant has been signed for twenty percent of eligible project costs, provided:
    (i) That the grantee qualifies for the higher grant as defined in (e) of this subsection; and
    (ii) That the original grant agreement has not been terminated or closed out.
    (g) The grant or grant portion of a combination loan and grant, once signed by all parties, may not be reduced despite any subsequent improvement in water supply conditions.
    (2) Eligibility conditions for each proposed agricultural project or measure are:
    (a) The proposed project or measure must be within an area declared to be suffering from drought conditions as defined in WAC 173-166-030(2).
    (b) The public body applying for emergency funds must be receiving, or be projected to receive, less than seventy-five percent of normal water supply and experiencing, or be expected to experience, undue hardship as a result for the previously established activity for which they seek funding assistance.
    (c) The proposed project or measure must be for a beneficial use involving a previously established activity or purpose.
    (d) The proposed project or measure must assist in alleviating a water shortage.
    (e) The public body receiving the loan must satisfy ecology as to its ability to repay the loan and complete the project or measure.
    (f) Water derived from the project or measure must be put to beneficial use as a substitute for water not available because of a drought.
    (g) Water derived from the project or measure must not be used to irrigate new lands.
    (h) The proposed project or measure must not adversely affect existing rights, including both instream and out-of-stream rights.
    (i) All required permits and approvals for the proposed project or measure must be obtained by the applicant prior to a loan or grant agreement being signed.
    (3) Eligible projects that may be funded for drought relief of irrigated agriculture include, but are not limited to:
    (a) Pumps and accessories.
    (b) Discharge lines.
    (c) Pipelines.
    (d) Canals and laterals with control structures.
    (e) Liners for leaky pipes and canals.
    (f) Diversion structures.
    (g) Reregulating reservoirs.
    (h) Measuring devices.
    (i) Wells with pumps and accessories.
    (4) Eligible measures that may be funded include the means for implementing water conservation procedures, acquiring alternate water sources, or transferring water rights, provided that the proposed measure represents an additional cost to the applicant as the result of drought conditions, and not as a substitute for normal water supply costs.
    (a) Types of eligible measures for implementing water conservation procedures include, but are not limited to:
    (i) Irrigation scheduling programs and activities, including the necessary personnel to accomplish such activities.
    (ii) Education programs.
    (b) Types of eligible measures for acquiring alternate water sources or transferring water rights include, but are not limited to:
    (i) Water leasing fees.
    (ii) Repair costs.
    (iii) Power costs.
    (5) Priority will be given to those proposed agricultural projects and measures which:
    (a) Need additional water supplies. Need will be measured by:
    (i) The short-term and long-term effects that the water shortage would have on the applicant's crops in the absence of drought relief;
    (ii) The capability and reliability of the proposed project or measure to provide an emergency water supply to the applicant;
    (iii) The percent of water shortage expected for each applicant.
    (b) Are the most effective in achieving long-term reductions (conservation) in water requirements and/or more efficient use of available supplies.
    (c) Present no, or minimal, overall environmental impacts, including any detrimental effects to wetlands. Any such impacts should be identified to the best extent possible by the applicant at the time of application.
    (6) Preference will be given to those public bodies implementing water conservation plans, water system efficiency improvements, and other drought contingency actions in addition to the funding assistance applied for under this chapter.
    [Statutory Authority: RCW 43.83B.420. WSR 91-03-081 (Order 90-53), § 173-166-100, filed 1/17/91, effective 2/17/91.]
RCW 43.83B.420. WSR 91-03-081 (Order 90-53), § 173-166-100, filed 1/17/91, effective 2/17/91.

Rules

173-166-030,173-166-030,