Washington Administrative Code (Last Updated: November 23, 2016) |
Title 173. Ecology, Department of (See Titles 197, 317, 372, and 508) |
Chapter 173-160. Minimum standards for construction and maintenance of wells. |
Section 173-160-121. What should I know about drilling wells that require water right permits?
Latest version.
- (1) Unless a groundwater withdrawal is exempt from the permit requirements under RCW 90.44.050, a well cannot be drilled without the well owner first obtaining a water right permit from the department authorizing the use of water from the well.(2) The licensed operator must have a copy of the water right permit or certificate on site at all times.(3) Every well that requires a permit shall be constructed to meet the provisions of that permit. Provisions may include:(a) Limitations on zones of completion.(b) Special sealing requirements.(c) Special casing and liner requirements.(d) Other specific construction and testing details.(4) As provided in WAC 173-548-050, no water well may be constructed for any purpose in subbasins closed in the Methow water resources regulation:(a) Including those exempted from permitting under RCW 90.44.050;(b) Unless written approval has been obtained from the department prior to beginning well construction.[Statutory Authority: Chapter 18.104 RCW. WSR 09-01-125 (Order 08-10), § 173-160-121, filed 12/19/08, effective 1/19/09. Statutory Authority: Chapter 18.104 RCW and RCW 43.21A.080. WSR 98-08-032 (Order 97-08), § 173-160-121, filed 3/23/98, effective 4/23/98.]
Chapter 18.104 RCW. WSR 09-01-125 (Order 08-10), § 173-160-121, filed 12/19/08, effective 1/19/09. Statutory Authority: Chapter 18.104 RCW and RCW 43.21A.080. WSR 98-08-032 (Order 97-08), § 173-160-121, filed 3/23/98, effective 4/23/98.
Rules
173-548-050,