Section 173-157-110. What types of information will I need to provide as part of my application?  


Latest version.
  • Your application for an ASR project must contain, at a minimum:
    (1) A description (conceptual model) of the hydrogeologic system (see WAC 173-157-120) prepared by a hydrogeologist licensed in the state of Washington.
    (2) A project operation plan (see WAC 173-157-130) with a description of the pilot and operational phases of the ASR project prepared by an engineer or geologist licensed in the state of Washington.
    (3) A description of the legal framework (see WAC 173-157-140) for the proposed project.
    (4) An environmental assessment and analysis (see WAC 173-157-150) of any potential adverse conditions or potential impacts to the surrounding ecosystem(s) that might result from the project, along with a plan to mitigate such conditions or impacts.
    The environmental assessment will establish whether a determination of nonsignificance or an environmental impact statement is required per SEPA regulations.
    (5) A project mitigation plan (see WAC 173-157-160), if required.
    (6) A project monitoring plan (see WAC 173-157-170).
    [Statutory Authority: RCW 90.03.370 (2)(b) and 90.44.460. WSR 03-03-081 (Order 02-06), § 173-157-110, filed 1/15/03, effective 2/15/03.]
RCW 90.03.370 (2)(b) and 90.44.460. WSR 03-03-081 (Order 02-06), § 173-157-110, filed 1/15/03, effective 2/15/03.

Rules

173-157-120,173-157-130,173-157-140,173-157-150,173-157-160,173-157-170,